Our company was deeply involved in the construction of the steel structure of Guangzhou Baiyun International Airport's T3 terminal building. We supplied a total of 7,320 tons of submerged arc welded pipes, high-frequency welded pipes, and hot-rolled seamless pipes for the project. At the same time, we also provided precision cutting and anti-corrosion deep processing services.
Détails du cas
As a professional steel supplier and comprehensive processing service provider, our company has provided the exclusive core pipe materials for the major steel structure project of Guangzhou Baiyun International Airport Terminal 3 throughout the entire process. We have supplied a total of 7,320 tons of special steel structure pipes including submerged arc welded pipes, high-frequency welded pipes, and hot-rolled seamless pipes.
We also provided integrated processing services for pipe cutting and anti-corrosion painting throughout the entire process, enabling the pipes to be directly put into on-site assembly upon leaving the factory. This one-stop solution meets the raw material and processing support requirements of the project.
All products strictly comply with national steel structure, pressure pipeline, and airport building special specification standards. A closed-loop quality control system is established from raw material smelting, forming and manufacturing to deep processing. All materials are provided with complete and compliant testing and quality assurance documents, ensuring stable and reliable quality.
With our large-scale supply capacity, mature deep processing support system, and strict quality control standards, we have laid a solid material foundation for the super-large steel structure main project of Guangzhou Baiyun International Airport Terminal 3, effectively ensuring the smooth implementation of the national key transportation hub project.

